Documents & Reports - Help Center
Adding documents through your AI, upload limits and statuses, getting a good report, and downloading what PrecisionDocs makes.
How do I upload documents correctly, and what are the current limits?
Documents reach a project through your assistant, and how depends on which one you use:
- Claude Code or Codex can read a file on your computer and upload it. Ask:
Upload ./geotech-report.pdf to my Maple Street project. - Claude or ChatGPT cannot send a file from your computer to PrecisionDocs. While a new project is being set up, add your documents on the sources list your assistant opens in the chat - it holds them and sends them when the project starts. Once the project exists, give your assistant a link PrecisionDocs can open and ask it to add the file, or use Claude Code or Codex for the upload.
Wait for the file status to reach Ready before asking questions against it, and ask by topic or by filename when you want precise retrieval. Your own documents and links are not part of the free plan.
Supported formats include PDF, DOCX, HTML, plain text, spreadsheets, PowerPoint, images, and Markdown.
How an upload runs:
- Your assistant asks PrecisionDocs for a one-time upload link, sends the file to it, then tells PrecisionDocs the upload is done. PrecisionDocs then reads and indexes it in the background, which can take minutes for a large PDF.
- Sending the file is free. Processing it is charged like any document ingestion.
- If the upload link expires before the file arrives, your assistant asks for a fresh link to the same upload and sends it again.
- If only part of a large PDF matters, extract the relevant chapters into a smaller file before you add it, so processing time goes where you need it.
Current default limits:
| Limit | Default |
|---|---|
| Max file size | 2,000 MB per file |
| Daily upload volume | 51,200 MB (50 GB) per day |
| Concurrent processing | 16 files at once |
| PDF page cap | 10,000 pages per PDF |
These are the defaults; limits are set per workspace.
If a file is rejected, your assistant is told the configured limit or the failure reason, so you can trim it, split it, or add only the relevant chapters.
What do upload statuses mean, and what should I do if one fails?
Added documents move through processing stages before they become searchable. The sources list on Project Home shows where each one stands, and your assistant can read the same status.
- Queued - accepted and waiting for processing
- Parsing - extracting text, figures, tables, and page structure
- Chunking - preparing the extracted content for retrieval
- Embedding - generating the searchable entries
- Indexing - writing the final document records
- Ready - the document is searchable and available to the agent
- Needs approval - the source is waiting on a decision before it continues. Ask your assistant what it is waiting for.
- Failed - processing did not complete
- Canceled - processing was stopped before it finished
Do not ask questions against a file until it reaches Ready. A file that never got there is not something the agent can see, however long ago you added it.
If an upload fails or is rejected, ask your assistant why. The cause comes back in plain language (PDF too long, Word document password-protected, image text unreadable, over the size limit).
- To retry, ask your assistant to upload the file again.
- If the file was rejected for size, the limit comes back with the refusal. Split the document or extract the chapters you need.
How do I get the best Due Diligence report?
A Due Diligence report is generated on demand - ask your assistant for one. It is not made during project setup, and there is no draft waiting on the project home. Waiting until you have added documents and verified facts is deliberate: the report is far stronger with that context than it would be from project-creation data alone.
Best-practice sequence for a high-quality report:
- Check that the city and county codes have loaded.
- Review the auto-generated Feasibility Assessment to spot obviously wrong facts.
- Add the critical consultant documents you want referenced (survey, geotech, Phase I ESA, zoning letter).
- Correct any wrong facts through your assistant - zoning corrections (project owners only), parcel data corrections, agent directives like "For the stormwater section, lean on the county Title 5 requirements over the city overlay."
- Ask the agent for individual topic checks: flood, wetlands, soils, environmental, ordinance, and major constraints.
- Resolve obvious source conflicts before you generate the report.
- Ask for the report once the facts are right.
Report content reflects what you settled with the agent:
- Facts you correct through your assistant win over the data captured when the project was created when the report is regenerated.
- Per-section directives you give the agent (e.g., "keep the executive summary under 200 words") are followed when the report is written.
- Wetland, flood and soil sections use the acres inside your parcel, so you see things like "0.7 acres of Zone AE within parcel boundary" instead of "parcel touches Zone AE".
- The DD report composes the latest Feasibility Assessment section when it exists, so review that deliverable before the final DD export.
Generation expectations:
- Progress runs from 0 to 100% while the report is researched, written and checked.
- The final check is bounded: it checks for missing required sections, evidence gaps, and obvious contradictions, but it does not replace human engineering review.
- Typical regeneration takes about 1-3 minutes depending on document volume and source complexity.
After generation:
- Review the report against its cited evidence.
- If a section is wrong, correct the underlying facts or give the agent the direction you want for that section, then generate the report again.
- Download the DOCX only after the factual sections look right.
What's in the auto-generated Feasibility Assessment?
A Feasibility Assessment is made automatically while the project is set up and gives a three-tier risk view right away, before you upload anything.
Tier 1 - Deterministic site risks, computed from the mapped data by rule rather than written:
- Flood zone classification + acreage within parcel
- Wetlands presence + class + acreage
- Seismic Site Class (ASCE 7-22)
- Elevation profile + slope range (USGS 3DEP)
- Frontage adequacy + ROW classification
- Utility proximity and provider-confirmation caveats when reviewed local utility layers are available
- Annexation or jurisdiction-boundary coordination flags
- PFAS and environmental-screening context where public evidence exists
- Stormwater overlay flags
Tier 2 - Use-case feasibility, evaluated against your project type:
- Zoning compatibility
- Entitlement path: by right, special use, rezoning required, or variance required
- Parking / density adequacy
- Environmental + geotech context
Tier 3 - Alternative use scenario comparison - a matrix that scores common alternative project types (e.g., multifamily / industrial / mixed-use) against the same Tier 1 + Tier 2 framework so you can quickly see if a pivot is worth exploring.
The assessment is versioned and downloadable as DOCX. The Feasibility Assessment and DD report remain separate generated deliverables.
Use the assessment as a screening tool. For surveyed elevations, utility availability, wetland delineation, or provider service commitments, upload the authoritative project document or confirm directly with the agency/provider before treating the finding as final.
How do I download reports, maps, and other deliverables?
Every deliverable a project produces is listed on Project Home, in the Generated tab of the documents card, where you can download it. Your assistant can also list them and give you a download link.
Typical outputs include:
- Due Diligence reports (DOCX)
- Feasibility Assessments (DOCX, versioned)
- FEMA flood maps (PDF)
- FIRMette / FIRM panel references when FEMA source data supports them
- Wetland maps (PDF)
- Soil reports (PDF)
- Road / frontage maps (PDF)
- Combined site hazard maps (PDF, layered: parcel + flood + wetlands)
- Site location maps (PDF)
- Contour sheets (PDF)
- Drainage exhibits (PDF)
- GIS exports (Shapefile .zip, KMZ, KML, GeoJSON, or DXF)
- Other files the agent produces in answer to your questions
To download:
- Ask your assistant for the file, or open the Generated tab on Project Home.
- A download link from your assistant works once and expires after 15 minutes, so ask for a fresh link rather than reusing an old one.
- For GIS data, ask your assistant to export the layer set and format the receiving tool needs.
- If you need a refreshed version, regenerate or revise the output through your assistant instead of reusing an outdated file.
Download links go through PrecisionDocs and never expose where the file is stored.