PrecisionDocs

Chat & Workflows - Help Center

How to run a guided workflow, ask better questions, verify sources, and correct facts.

How do guided workflows work?

Guided workflows are step-by-step due-diligence walkthroughs your assistant runs for you. Use them when you want a structured path instead of deciding every prompt yourself.

How to start one:

  • Ask your assistant which PrecisionDocs workflows it can run, or name one: Run the PrecisionDocs site yield workflow for my Maple Street project.
  • In Claude Code the workflows are also offered as slash commands.
  • Your assistant works through the steps in order, reads what the project already settled first, and skips a step the project's evidence already answers. It asks you before anything that generates a report or document or changes a project decision - choosing a workflow is not that confirmation.

Current workflow paths:

WorkflowBest use
Site YieldBuildable envelope, net acreage, yield-killer screen, and a unit/GLA yield range
Site Cost EstimateScreening-level opinion of probable cost with itemized earthwork, utility, and paving line items and an editable Excel workbook
Site SnapshotParcel facts, structures, demolition triggers, and market context
Environmental & Physical ConstraintsFlood, wetlands, soils, terrain, seismic, PFAS, and combined hazard mapping
Zoning & EntitlementsZoning designation, dimensional standards, overlays, and stormwater rules
Infrastructure & AccessUtilities, frontage, road authority, annexation exposure, and adjacent parcels
Screening & Risk AnalysisScreen the site for deal-killers first - permitted use and fatal flaws, flood and water, ground conditions, access, and utilities - then a full feasibility assessment weighing the risks
DeliverablesPermit list, findings summary, and Due Diligence report

Best practice: run one workflow at a time, review citations after each major answer, and add project-specific studies before starting workflow steps that ask the agent to review consultant reports.

How does the Screening & Risk Analysis workflow work?

The Screening & Risk Analysis workflow screens a site for what could kill the deal before you spend on it, then closes by generating a full feasibility assessment that weighs the risks it surfaced. Ask your assistant to run the PrecisionDocs screening workflow for your project.

It runs in seven steps, worst-risk-first:

  1. Use & Fatal Flaws - is what you want to build permitted in your zoning district, and is anything on this site an outright deal-killer? If the use is not by right, the agent names the realistic path (conditional or special use, the most conservative rezone target, or a planned unit development).
  2. Flood & Water - which FEMA flood zones touch the parcel, whether a special flood hazard area or floodway affects the build, the base flood elevation if one exists, and what flood status changes about design, insurance, and approvals.
  3. Wetlands, Soils & Slope - mapped wetlands, hydric soils, high water table, and steep slopes, and what each one limits about where you can build and what it adds to cost.
  4. Access & Roads - street frontage, who controls access, whether a driveway or DOT permit is needed, and - for a single point of access - whether that is an emergency-access concern at the scale you described.
  5. Utilities & Providers - which utilities actually reach the site, who serves each one, what is confirmed from real data versus assumed, and how to reach each provider to verify.
  6. Permits & Approvals - the permits and approvals the project needs and how long each typically takes to review.
  7. Feasibility Report - a full feasibility assessment for the site (factoring in any site studies you have uploaded) as the deliverable.

How to read the results:

  • Each step is a screening pass, not a confirmed finding. Values drawn from public data (flood, wetlands, soils, utilities) are screening-grade - verify surveyed elevations, wetland delineation, and provider service commitments with the agency or provider before relying on them.
  • The workflow does not replace the deal-killer judgment - it surfaces the risks so you can decide. When an answer sits on a decision fork, the agent names the alternative before answering.
  • The closing step produces a Feasibility Assessment deliverable - a three-tier risk view (deterministic site risks, use-case feasibility, and an alternative-use comparison) - that is versioned and downloadable as DOCX.

How does the Site Cost Estimate workflow work?

The Site Cost Estimate workflow builds a screening-level opinion of probable cost for horizontal site development, then hands you an editable Excel cost workbook. Ask your assistant to run the PrecisionDocs cost estimate workflow for your project.

It runs in six steps, smallest scope to largest:

  1. Scope & Program - agree on the program being priced (use, building or lot scale, and whether existing structures come down) before any pricing.
  2. Site Cost Drivers - surface the terrain, soils, stormwater, utility proximity, and frontage conditions that push costs up or down.
  3. Earthwork & Grading - rough cut and fill, topsoil, erosion control, and detention-basin excavation.
  4. Wet Utilities - sanitary, water, and storm mains or service connections, run lengths, tie-ins, and fire protection where triggered.
  5. Paving & Access - internal streets or the parking field, curb and gutter, driveway aprons, markings, and accessible ramps.
  6. Cost Summary - everything rolled up into itemized earthwork, utility, and paving tables with mobilization and a visible contingency, then the downloadable workbook.

How to read the numbers:

  • This is a Class 5 conceptual estimate (AACE analog) with an expected accuracy range of -30% / +75%. Treat it as an order-of-magnitude screen, not a bid.
  • Quantities are parametric screening values. Each line item states whether it was measured from your site, derived from code requirements, or a screening default - and lists what was excluded and why. Verify every quantity against an engineered grading, utility, and paving design before relying on it.
  • The contingency is visible and editable in the workbook, and the underlying cells use live formulas so your team can adjust and extend the estimate.

Use your own pricing: the estimate ships with national baseline unit prices adjusted for your state. To reprice against your local costs, paste a unit-price list into your assistant and ask it to have PrecisionDocs apply it - your prices override the baseline while the quantities stay the same.

Can I ask the agent how to use PrecisionDocs?

Yes. Ask your assistant for PrecisionDocs workflow help when you need step-by-step help, where something lives, or the right sequence for a task.

Good use cases:

  • How do I export GIS layers for Civil 3D?
  • Is my project still waiting on the county code?
  • What is the safest workflow for correcting zoning?
  • How should I troubleshoot a missing wetland or soil layer?

The agent can search the same Help Center content that appears on the public and in-app help pages, then summarize the article that best matches your question.

Use your assistant for workflow guidance. When you need the PrecisionDocs team - to correct an ordinance source, investigate a failed setup, or answer a billing question - email info@precisiondocs.ai.

How should I ask questions to get the best answers?

The agent performs best when you ask task-shaped questions instead of broad prompts.

Good pattern:

  1. Name the subject: parcel, report, ordinance topic, or document.
  2. State the outcome you want: summary, comparison, risks, checklist, or draft language.
  3. Add the scope: one parcel, one uploaded report, one code section, or one engineering topic.
  4. Ask for sources when the answer matters operationally.

Examples:

  • Summarize the floodplain constraints for this site and cite the source data.
  • Search the uploaded geotech report for groundwater depth and bearing recommendations.
  • What ordinance sections control parking, setbacks, and stormwater for this parcel?
  • Draft a client-ready risk summary for the Phase I ESA findings.

Weak prompt example: Tell me everything about this project.

Strong prompt example: Give me the top 5 development constraints for this site with citations and next steps.

How do I check sources and citations, and what if they conflict?

Use citations as your first quality check. Every PrecisionDocs answer comes back with its citations, and your assistant should keep them beside the claims they support. If it drops them, ask it to show the sources.

What to look for:

  • A citation should appear with every factual claim.
  • Ordinance sections and public datasets, named by their agency such as FEMA or USDA, are the strongest references for regulatory answers.
  • Uploaded documents are strong when the file came from your consultants or from jurisdictional correspondence.
  • Web results are supplementary. Verify them against the official record if the finding affects design, permitting, or fee exposure.
  • Parcel records come from county and state parcel layers. Where you have corrected a value, such as zoning, later answers use your value instead.
  • A supplemental ordinance is a reference source rather than the code resolved as governing. When it matters, ask your assistant which code governs the parcel.

Review sequence:

  1. Ask for the cited section, dataset, or document behind the claim.
  2. Check its source type: governing ordinance, supplemental ordinance, public dataset, uploaded document, parcel record, or web.
  3. Compare the claim to the cited text or map output.
  4. If you are preparing a client deliverable, verify every major constraint directly from the linked source before sending it out.

When citations are missing, weak, or conflicting, treat it as a review event rather than a formatting problem:

  • Ask the agent to restate the answer using only the source class you want: Re-answer using only the ordinance and the uploaded survey.
  • If two sources disagree, ask for a side-by-side comparison and keep both citations visible: These citations conflict. Compare them directly and tell me what the discrepancy is.
  • Prefer official ordinance and government datasets over supplementary web results.
  • If the source is still unclear, open the cited evidence directly before using the conclusion.

What should I do when the agent cannot find information?

Treat a "not found" answer as a source-routing problem first, not as the final answer.

Recovery sequence:

  1. Name the source set. Ask again using one source class: ordinance, uploaded documents, parcel data, government APIs, GIS layers, or web search.
  2. Ask for a narrower target. Replace "site constraints" with "parking count", "front setback", "FIRM panel", "NWI wetland class", or "stormwater detention trigger".
  3. Check the relevant source. Open Project Home or ask your assistant which sources answered and which are pending, failed, or missing. Use available evidence now; a missing source limits only conclusions that need it.
  4. Add the missing source. Ask your assistant to add the consultant report or an official source URL to the project, or to find and index a separate zoning/LDC/subdivision code product.
  5. Ask for the evidence path. Show which sources you searched and what was missing. This helps distinguish "not in corpus" from "source exists but the prompt was too broad."

Good recovery prompts:

  • Search only the uploaded ALTA survey for access easements and tell me if the answer is not in the survey.
  • If the zoning standards are in a separate zoning code, find and index that source before answering.
  • Use official FEMA/NWI/USDA sources only and tell me which dataset returned no data.

How do I correct a parcel's zoning?

A parcel's zoning comes from the jurisdiction's zoning map where one is published, or you confirm it; it can be stale or missing. Correcting it replaces the value for your project only.

Record it directly (project owner): tell your assistant the correct district, for example Parcel 1 is zoned R-2, not R-1. Record that correction. Your assistant shows you the district on record and records the one you confirm. Available facts and deliverable sections remain usable while the district is unconfirmed; a calculation may still need that specific confirmation.

Have it checked against the ordinance (project owner, if the ordinance agrees): state the correction explicitly - This parcel is actually zoned R-2, not R-1 - verify against the ordinance. The agent checks the indexed ordinance text and records the correction if the ordinance confirms it.

Either way the correction:

  • replaces the earlier value in every later parcel lookup, report, and feasibility assessment
  • shows the corrected code as the zoning value on Project Home
  • records who changed it, when, and what it was, for audit

If your correction does not appear, it is almost always one of these:

  • You are not the project owner. Only the owner can record a zoning correction, on either path, and a member's correction does not save. Ask the owner to set it.
  • The correction was too vague. "This is wrong" is not enough - name the district you believe is correct, and for the ordinance check the ordinance has to support it.
  • It landed on a different parcel. Corrections are per parcel; check the parcel index on a multi-parcel project.

To confirm a correction landed, check that the zoning value on Project Home now reads the corrected code, or ask the agent for the parcel's zoning and see the corrected value come back.

Continue reading

Other help topics

PrecisionDocs
Reload page